Stabilization and re-leveling of industrial floors at JSC "AD Plastik"

THE RESTORATION OF THE BEARING CAPACITY
Category
Industrial premises
Object
Production workshop
Focus
Concrete floor slabs
Location
Kaluga, Russia
Time of work
2014 г.
The timing
8 days
TECHNOLOGY
SLAB LIFTING

AD Plastik CJSC is an international company for the production of plastic parts for subsequent installation on cars.

In 2014, new equipment with a total weight of 86 tons was installed in one of the production workshops of AD Plastik, after which there were deformations of the concrete floor plate.

With the help of URETEK technology, works were performed to strengthen the bearing capacity of soils down to a depth of -3.5 m (from the surface of the floor plate), as well as to restore the bearing capacity of the floor slab in places of deformation.

All the works were cut without stopping production of AD Plastik CJSC. The work completion period was 8 calendar days. Uretek ground Engineering LLC provided a guarantee to AD Plastik CJSC for a period of 60 months.

If you have not found an object or a situation similar to yours in the portfolio on the website, then order a specialist to select a project to analyze the pros and cons of technologies from the extensive database of completed Uretek projects.
Back to projects
Standard projects and cost
Leave a comment
Comments
Thank you for your comment!
Close

Leave your phone number and our consultant will contact you

Choose a convenient time to call

Leave your email and we will send you this article

  • Services
  • Uretek methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    Uretek