Strengthening of the base and lifting of slab foundations under silo tanks

Re-leveling of industrial structures
Category
Industrial facility
Object
Silo tanks on slab foundations
Focus
Strengthening the foundation and re-leveling the foundations
Location
Murmansk region
Time of work
2019 г.
The timing
12 days
TECHNOLOGY
DEEP INJECTION & SLAB LIFTING

Object:

Slab foundations of reactor workshops at the chemical industry facility

Method:

Deep injection, Slab Lifting

Problem:

When installing iron-concrete slab-type foundations for the reactors, uneven subsidence occurred, which caused the reactors to be skewed. According to the technological features of production, the requirements for the verticality of reactor structures are ±5 mm for the support "legs".

Task:

Horizontal re-leveling of reactor structures due to lifting of foundations.

Solution:

To solve this problem, preliminary strengthening of the foundation soil was carried out to avoid further movement and re-leveling of reactor structures in the horizontal plane by lifting the foundations.

If you have not found an object or a situation similar to yours in the portfolio on the website, then order a specialist to select a project to analyze the pros and cons of technologies from the extensive database of completed Uretek projects.
Back to projects
Standard projects and cost
Leave a comment
Comments
Thank you for your comment!
Close

Leave your phone number and our consultant will contact you

Choose a convenient time to call

Leave your email and we will send you this article

  • Services
  • Uretek methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    Uretek