en
ru

We work throughout Russia

Strengthening the eroded base of the column foundation

Object
Production shop
Focus
Foundations of supporting columns
Location
Moscow region
Time of work
2020 г.
The timing
2 days
TECHNOLOGY
DEEP INJECTION

Profile:

Capital construction of the "Reconstruction of the bakery products factory»

Method:

Uretek Deep Injection.

Problem:

During the construction of a frame-type building, the soil of the base of one of the column foundations with a plan size of 3600*3600mm was washed out. Further loading of the foundation proved to be risky.

Task:

Strengthening of the soil of the base of the foundation of the columns.

Solution:

To solve this problem, a preliminary comprehensive survey of the foundation foundation was carried out. According to the results of the survey, zones of decompressed ground of the base were identified directly at the contact point of the plate-ground and at a depth of up to -2.5 m. The technical solution implied deep strengthening of the soil of the base of the foundation of the columns with the device of a curtain in the erosion zone to prevent horizontal shear phenomena.

If you have not found an object or a situation similar to yours in the portfolio on the website, then order a specialist to select a project to analyze the pros and cons of technologies from the extensive database of completed Uretek projects.
Back to projects
Standard projects and cost
Leave a comment
Comments
Thank you for your comment!
Close

Leave your phone number and our consultant will contact you

Choose a convenient time to call

Leave your email and we will send you this article

  • Services
  • Uretek methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    Uretek