Restoring the functionality of roadway structures without stopping traffic

Reinforcement of foundation soils and stabilization of concrete slabs
Category
Transport infrastructure
Object
Durban Port Highway
Focus
Stabilization of the base of concrete slabs and restoration of waterproofing
Location
Durban, South Africa
Time of work
2014 г.
The timing
77 days
TECHNOLOGY
DEEP INJECTION & SLAB LIFTING

SUMMARY

Durban: one of Africa’s busiest ports. From here containers and goods from around the globe join the highway system to South Africa’s industrial interior. One of the major road transport artery is the Solomon Mahlangu Highway. This highway was designed to carry one million vehicles per year in each direction. Due to the heavy continuous flow of traffic the surface started to crack and deteriorate. Voids were discovered in the layer works 800mm below the concrete surface. In addition the bitumen layer between the original road slab and the more recent surface concrete slab was disintegrating due to water action.

OBJECTIVES

Uretek was approached to strengthen and stabilize approximately 42000 square metres of concrete slabs in the Western direction. The rehabilitation work needed to be completed in five months.

TECHNOLOGY APPLIED

A combination of the Uretek Slab Lifting and Deep Injection technologies have been applied simultaneously, thereby filling voids at a depth of 800mm below the surface and at the same time consolidating the deteriorated bitumen layer between the two concrete slabs.

OUTCOME

It has been determined that the Uretek process has been successfully implemented in extending the life span of the existing road slabs, thereby avoiding having to reconstruct the entire section of the concrete highway which was rapidly deteriorating.

 In total 48564 square metres of road slabs were stabilized in 77 working days. Due to the cost savings experienced in the Western direction of the highway, the client has decided to use Uretek to stabilize the concrete road slabs in the nearby Inanda Road Highway upon completion of the initial contract and to continue in the Eastern direction of Solomon Mahlangu Highway in the near future.

If you have not found an object or a situation similar to yours in the portfolio on the website, then order a specialist to select a project to analyze the pros and cons of technologies from the extensive database of completed Uretek projects.
Back to projects
Standard projects and cost
Leave a comment
Comments
Thank you for your comment!
Close

Leave your phone number and our consultant will contact you

Choose a convenient time to call

Leave your email and we will send you this article

  • Services
  • Uretek methods
  • Projects
  • Video
  • About us
  • Contacts
  • Moscow
    +7 495 268 01 47
    St. Petersburg
    +7 812 627 15 05
    Rostov on Don
    +7 863 308 17 98
    Kazan
    +7 843 206 03 64
    Nizhny Novgorod
    +7 831 429 17 68
    Sevastopol
    +7 869 222 31 91
    Novosibirsk
    +7 383 280 42 61
    Uretek